MIN | $30.24 (-6.09%)
MIN | $30.24 (-6.09%)

NextGen crushing plant

We have pioneered the design and development of the next revolution in modular crushing plants.

Mineral Resources Image

Our NextGen modular crushing plant replaces higher-cost fixed plants and improves the environmental impact of crushing construction and operations.

This patented technology has been developed with our extensive experience as the world's largest crushing and screen contractor.

With capacity ranging from five to 50 million tonnes per annum, NextGen crushers deliver significantly lower dust and noise emissions, consume less energy and can be rapidly deployed in remote operations.

Other benefits include:

  • suitability for a range of applications from stemming through to hard-rock processing
  • fully modular ‘plug and play’ crushing and screening facility – pin connected, fully factory assembled and tested transportable modules 
  • fast installation and limited site work required 
  • a 30-year service life, similar to a fixed plant
  • modular, scalable plant adaptable to client requirements
  • reduced site construction hours, lower risks and a reduction in construction materials
  • a range of innovations relating to operability, maintainability, reliability and sustainability including dust and noise reduction and minimal environmental impact
  • smart technology online monitoring of equipment for vibration and temperature levels
  • structural design in full compliance with ISO Standards, Australian Standards and the American Institute of Steel Construction Standards (AISC).
Mineral Resources Image

NextGen 3

In 2023, our NextGen 3 plant was launched with innovative carbon fibre vibrating screens, developed in-house to replace traditional steel vibrating screens.

Benefits of carbon fibre screens include:

  • significantly higher structural strength than carbon steel, which is prone to fatigue corrosive cracking
  • service life three to five times longer than steel screens
  • applicable in wet processing and dry screening environments
  • built in less than six weeks at CSI’s CarbonArt facility.
Mineral Resources Image